Cow Lane Drainage Scheme

Back

The Cow Lane Drainage scheme for CS Spencer was R&W’s first rail scheme.

The works involved deep drainage within a very tight site and required extensive temporary works designs for the excavation because of the 1.8m diameter pipes that had to be lifted.  Once on site CS Spencer discussed an issue they had with the existing drainage and - following input from our site team - instructed additional works to be undertaken.

This scheme was delivered on programme and received very positive feedback. CS Spencer are keen for R&W to quote for future schemes.

As it was our first rail scheme, the project received a thorough internal audit. Happily, we passed without any issues raised.